The principle behind the workforce of ESFPT is to maintain the assigned time frame for each activity right from the design stage until the completion of all the site works. The design team endeavors in providing more economical, architecturally viable, and structurally secured structural solutions, and when it comes in the hands of the execution team, there is no compromise on the quality of work.
• PT Slab with minimum slab thickness
• PT slab + U-Boot System
• U-Boot Slab
• PT Voided Infill Slab
• Precast & Delta Beam System